Land Rover Bodyshop 3
Exmac & V-Installations
Project Tonnage: circa 1000t
SCL designed, manufactured and erected structural steelwork to support the manufacturing track in the latest Body In White Installation within Landrover Solihull. All roof hung, the steelwork was taken through design from conception and manufacture to finish install within 6-7 months.