Biogen Waste Reduction Plant, Rushden
Rolton Group
SCL completed the design, supply and installation of structural steelwork to form a new waste reduction and power generation plant including steel frame to main waste reception building, mezzanine level office structures, plant supports, staircases and associated cladding systems.
SCL further supplied and installed pre-cast concrete push walls and industrial door installations on a sub contract basis.